Proposed project development of Economic Corridors, inter corridor, feeder.. proposed by National Highways Authority of Inida, Project implementation unit-Panvel, Raigad.(Proposed 6-lane access-controlled section of NH-348B (Greenfield) from Pagote (Km. 0.100) to Chowk (Km. 29.319),) Read more about Proposed project development of Economic Corridors, inter corridor, feeder.. proposed by National Highways Authority of Inida, Project implementation unit-Panvel, Raigad.(Proposed 6-lane access-controlled section of NH-348B (Greenfield) from Pagote (Km. 0.100) to Chowk (Km. 29.319),)
Establishment of 3 KLPD Mahua Flower Based Distillery Unit along with Liquor Bottling unit of capacity 334 Cases per day for manufacturing of Potable Alcohol at Gat No. 670-A-2, Plot No. 85, 86, 87 and 117, Shree Samarth Sahakari Audyogik Vasahat Ltd., Pimpalgaon Baswant, Taluka Niphad, District Nashik, Proposed by M/s. Raja Rum Rye Pvt. Ltd. (RRRPL) Read more about Establishment of 3 KLPD Mahua Flower Based Distillery Unit along with Liquor Bottling unit of capacity 334 Cases per day for manufacturing of Potable Alcohol at Gat No. 670-A-2, Plot No. 85, 86, 87 and 117, Shree Samarth Sahakari Audyogik Vasahat Ltd., Pimpalgaon Baswant, Taluka Niphad, District Nashik, Proposed by M/s. Raja Rum Rye Pvt. Ltd. (RRRPL)
Executive Summary w.r.t. Expansion of Sugar Factory from 4,900 TCD to 10,000 TCD, Distillery from 40 KLPD to 300 KLPD by using C/ B Heavy Molasses/ Cane Juice/ Grain and Establishment of 35 MW Cogeneration Plant by Atharv Intertrade Pvt. Ltd. AT VILLAGE: HALKARNI, TAL.: CHANDGAD, DIST.: KOLHAPUR. Read more about Executive Summary w.r.t. Expansion of Sugar Factory from 4,900 TCD to 10,000 TCD, Distillery from 40 KLPD to 300 KLPD by using C/ B Heavy Molasses/ Cane Juice/ Grain and Establishment of 35 MW Cogeneration Plant by Atharv Intertrade Pvt. Ltd. AT VILLAGE: HALKARNI, TAL.: CHANDGAD, DIST.: KOLHAPUR.
Construction of Pavner (District Wardha) to Patradevi (District Sindhudurg) at Maharashtra – Goa Border- Super communication Maharashtra Shaktipeet Expressway-Package-II(Nanded , Hingoli, Beed, Latur, Parbhani and Dharashiv), total length 267, 480 Km, in the state of Maharashtra, Proposed by MSRDC Ltd,. Camp Office, Chhatrapati Sambhajinagar. The Public hearing is scheduled on 18.12.2025 at 11.30 a.m. At Collector Office, Latur. Read more about Construction of Pavner (District Wardha) to Patradevi (District Sindhudurg) at Maharashtra – Goa Border- Super communication Maharashtra Shaktipeet Expressway-Package-II(Nanded , Hingoli, Beed, Latur, Parbhani and Dharashiv), total length 267, 480 Km, in the state of Maharashtra, Proposed by MSRDC Ltd,. Camp Office, Chhatrapati Sambhajinagar. The Public hearing is scheduled on 18.12.2025 at 11.30 a.m. At Collector Office, Latur.
PH for Ethyl Acetate mfg with production capacity of 40 TPD, Proposed by M/s. Ashirwad Industries, Satara. on dt. 16.12.2025 time 11.00.AM Read more about PH for Ethyl Acetate mfg with production capacity of 40 TPD, Proposed by M/s. Ashirwad Industries, Satara. on dt. 16.12.2025 time 11.00.AM
Marki Mangli IV Coal Mine, Villages Hirapur, Mangli & Bhendala, Tehsil – Jhari Jamni, Yavatmal for Mining lease area: 201.69 Ha (Non-Forest) Proposed Production: 0.2 MTPA Coal, proposed by M/s Sobhagya Mercantile Limited (SML) B-61, Floor 6, Plot No.210, B-Wing, Mittal Tower, Free Press Journal Marg, Nariman Point, Mumbai. Read more about Marki Mangli IV Coal Mine, Villages Hirapur, Mangli & Bhendala, Tehsil – Jhari Jamni, Yavatmal for Mining lease area: 201.69 Ha (Non-Forest) Proposed Production: 0.2 MTPA Coal, proposed by M/s Sobhagya Mercantile Limited (SML) B-61, Floor 6, Plot No.210, B-Wing, Mittal Tower, Free Press Journal Marg, Nariman Point, Mumbai.
Kolgaon Expansion (Deep) open cast Mine, Wani Area WCL, Wani Tehsil Yavatmal for increase in production capacity from 0.60 MTPA to 0.80 MTPA and increse in project area from 397.25 Ja t520.60 Ha-reg. You are requested the upload the executive summary in English and Marathi on MPCB (web-site) public hearing. Read more about Kolgaon Expansion (Deep) open cast Mine, Wani Area WCL, Wani Tehsil Yavatmal for increase in production capacity from 0.60 MTPA to 0.80 MTPA and increse in project area from 397.25 Ja t520.60 Ha-reg. You are requested the upload the executive summary in English and Marathi on MPCB (web-site) public hearing.
Sugar unit from 4750 TCD to 7500 TCD of M/s. Vikasratna Vilasrao Deshmukh Manjara Shetkari SSK ltd,Vilasnagar, Chincholirao wadi,Tal & Dist-Latur. Read more about Sugar unit from 4750 TCD to 7500 TCD of M/s. Vikasratna Vilasrao Deshmukh Manjara Shetkari SSK ltd,Vilasnagar, Chincholirao wadi,Tal & Dist-Latur.
M/s. Shri Sant Shiromani Maruti Maharaj SSK, Latur, for proposed project for 105 KLPD Molasses/sugarcane syrup based distillery village-Maulinagar, Belkund, Tal-Ausa, Dist-Latur. Read more about M/s. Shri Sant Shiromani Maruti Maharaj SSK, Latur, for proposed project for 105 KLPD Molasses/sugarcane syrup based distillery village-Maulinagar, Belkund, Tal-Ausa, Dist-Latur.
PH for proposed 40 KLPD Malt & 2 KLPD Mahua based distillery plant proposed by M/s. Bapuna Spirits pvt.ltd, Nashik. Read more about PH for proposed 40 KLPD Malt & 2 KLPD Mahua based distillery plant proposed by M/s. Bapuna Spirits pvt.ltd, Nashik.