Main Content Linkसार्वजनिक सुनावणी तपशील 24/11/2020
| अनुक्रमांक | उद्योगाचे नावं व पत्ता | कार्यकारी सारांश / सीआरझेड मसुदा अधिसूचना | Date & Time | पर्यावरणविषयक सार्वजनिक सुनावणीचा आदेश | शेरा |
|---|---|---|---|---|---|
| 151 | Proposed Manufacturing Unit for the Production of Biodiesel having Capacity 30 TPD along with Production of Soap 10 TPD and Fatty Acid 10 TPD, Located at Survey No.: 32/3 & 34/A, Plot No.: 2-1/1C, Village: Balapur, Taluka: Dharmabad, District: Nanded. Proposed by M/s. MVP Oils and Energies Private Limited. | इथे क्लिक करा | - | ||
| 152 | Proposed Expansion in Production of PF Resin from 3,000 MTM to 6,000 MTM and Hardeners / Catalyst Activators (Cold Blending) from 1200 MTM to 3000 MTM and new product Foundry Consumable (Cold Blending) based products of Proposed Capacity 500 MTM at Gat No.: 251, 253/4/A, 253/6/A, 253/7/A, 253/8, 253/9, 255, Village: Atkargaon, Post: Mandad, Taluka: Khalapur, District: Raigad. Proposed by M/s. Gargi Huttenes Albertus Pvt. Ltd., Gat No.: 251, 253/4/A, 253/6/A, 253/7/A, 253/8, 253/9, 255, Village: | इथे क्लिक करा | - | ||
| 153 | Proposed Amalgamation & Modernization of Existing Metallurgical Activity at Plot D-2, D-3, D-3/1 & D-3/2, Kagal- Hatkanangale five start MIDC Kolhapur, Maharashtra, Proposed by M/s.Ghatge Patil Industries Ltd (Plant-2). | इथे क्लिक करा | - | ||
| 154 | M/s Torrent PSH4 Pvt Ltd are developing a 1200 MW capacity Saidongar-2 Maval Pumped Storage Project (i.e., PSP) at village Pali Tarf Kotal Khalati, Saidongar Village, Tal. Karjat, Dist. Raigad and Kusur Village, Tal. Maval, Dist. Pune. | इथे क्लिक करा | - | ||
| 155 | Expansion of Distillery from 30 KLPD to 45 KLPD (B & C- Molasses) and Sugar Factory from 2500 TCD to 7000 TCD by Shri Shankar Sahakari Sakhar Karkhana Ltd. Solapur - 413111, Maharashtra | इथे क्लिक करा | - | ||
| 156 | Proposed Manufacturing Unit of Fruit Base Distillery Plant along with Grapes Winery to Produce 5 KLD Spirit and 30 KLD Wine, at Gat. No.: 22/1/A/1, 22/2 Village: Bhilwad, Post: Kapshi, Taluka: Deola, District: Nashik proposed by M/s. Rajdheer Wine Pvt. Lt, Nashik. | इथे क्लिक करा | - | ||
| 157 | Proposed Manufacturing Unit of Fruit Base Distillery Plant along with Grapes Winery to Produce10 KLD Spirit and 60 KLD Wine at Gat. No.: 22 (Part), Village: Bhilwad, Post: Kapshi, Taluka: Deola, District:Nashik, proposed by M/s. Amur Spirits Pvt. Ltd., Nashik. | इथे क्लिक करा | - | ||
| 158 | Karwahi Dolomite Mine Project having Mine Lease Area: 12.28 Ha, Proposed Production of Dolomite is 2,78,903 TPA. at Khasra No. 625, 626, 627, 628, 629, Vill-Karwahi,Tal- Ramtek, Dist-Nagpur, Proposed by M/s. Shakuntala Minerals Pvt. Ltd. | इथे क्लिक करा | - | ||
| 159 | Active Pharmaceutical Ingredients (APIs) & Drug Intermediate Manufacturing unit at Gat No. 200/1, PO Lakhmapur Tal. Dindori Dist. Nashik, Proposed by M/s. Besi Drugs Pvt. Ltd. | इथे क्लिक करा | - | ||
| 160 | Singardip (Rithi) Stone & Murrum Quarry Project having Mine Lease Area: 1.12 Ha. Proposed Production of Stone & Murrum is 95,088 TPA Project Cost: 64.33 Lakh located at Gut No.: 137/3 (Part), Village: Singardip (Rithi), Tehsil: Hingna,Nagpur, Proposed by M/s. Jagruteshwar Metals Pvt. Ltd. through Shri Rakesh Omprakash Hemrajani Address: Singardip (Rithi), Post + Tehsil: Hingna, Dist. Nagpur, | इथे क्लिक करा | - |